Footings Dug and Concrete Poured at this Extension in Putney SW15

Week 1 on this kitchen extension in Putney and the foundations are being dug. For this project, the foundations have been dug 1500mm. Once the ground has been excavated, liquid concrete is poured in and then built upon with brick work. This will be the main structural frame of the construction so this has to be done to accurate structural calculations with precise building works. The team are doing well!